Soil sample drilling to slow traffic on 38th Avenue
Oct 04, 2022 | By: Ed FriedrichSoil sampling is part of the design phase, which will continue into next summer. Construction to to add bike lanes on both sides of the street and a sidewalk, planter strip and lighting on the east side will occur in 2024.
Read More